motor pin shaft motor dowel pin

FOB Reference Price:Get Latest Price
$1.00 - $100.00 / Pieces | 1 Piece/Pieces pin shaft (Min. Order)
Report Suspicious Activity
Overview
Quick Details
CNC Machining or Not:
CNC Machining
Type:
Broaching, Drilling, Laser Machining
Material Capabilities:
Aluminum, Brass, Bronze, Copper
Micro Machining or Not:
Micro Machining
Place of Origin:
Chongqing, China
Model Number:
Non-standard, stainless steel pin shaft
Brand Name:
cptc
Process:
Cnc Turning
Application:
industrial
Item:
pin shaft
Material:
Steel
Finish:
plated
Small order:
acceptable
Quality:
according to the tolerance requi
Product name:
pin shaft
Keyword:
CNC Macining Parts
Supply Ability
Supply Ability:
1000 Piece/Pieces per Month pin shaft
Packaging & Delivery
Packaging Details
standard export carton
Port
Chongqing Shenzhen Shanghai ,etc
Lead Time :
1-20 Days

pin shaft 
8 years OEM manufacture experience 
Material:steel 
Process:cnc machining 
machinery part

Pin shaft

 

Detailed Product Description
Brass and special material Machined Parts main range is:
1) Material:steel

2)Process: cnc machining, turning

3)Surface:polishing

4)Usage:Medical equipment parts, Electric/electronic equipment parts and Other machined parts
Our Capacity is:
1) Material: steel, copper, brass, aluminum, staineless steel, Very special Material
2) Equipment: CNC lathe, CNC milling machine, CNC high-speed engraving machine
3) Precision machining capability:
    a) Machine's rotating speed: 5, 000rpm - 30, 000rpm
    b) Machining precision tolerance: 0.005 - 0.01mm
    c) Roughness value: < Ra 0.2
    d) Minimum cutting tool: 0.1mm
4) Strick inspection instrument and ISO9001 control
5) Parts can be made according to customers' 
 

Company Information

CPTC:

 

We are the professional mark and seller of spare parts including gears,driving device,gear

racks,motor,gearbox, coupling, safety device. etc;electric products such as limit switch,overload sensor and indicator for hoist, tower crane, hoist and so on.
By our professional technology and engineer,we choose, design and mark the suitble parts for your construction machines with high quality.

 

Packaging&Shipping

Packaging Details:Wooden cases

 

Delivery Detail:1-20 Days

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

 

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, please feel free to contact us as below:

 

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like